Read Freedom's Forge Online

Authors: Arthur Herman

Freedom's Forge (23 page)

BOOK: Freedom's Forge
8.23Mb size Format: txt, pdf, ePub
ads

The president’s penchant for putting off big decisions was kicking in. He turned down Churchill’s request to help with the convoying of supply ships across the Atlantic, although he did allow British naval vessels to refuel and repair in American ports. Roosevelt also proclaimed a
security zone around the United States, warning off Axis warships—but it only extended midway between Brazil and Africa. Inside the zone, U.S. warships could track and warn others of the presence of U-boats, but could not take any further action.

To intimates, Roosevelt that spring seemed “cautious to the point of immobilization.”
41
Luckily, Bill Knudsen wasn’t.

 

Interior of Chrysler’s Detroit tank arsenal plant, Warren, Michigan.
Courtesy of the National Automotive History Collection, Detroit Public Library

Mass production takes time to get started.

—William S. Knudsen to FDR, 1941

AT NIGHT KNUDSEN
sat with his yellow legal pad and did the numbers.

Despite the strikes, production was going up. A year before, no tanks were being manufactured in the United States except those hand-made in government arsenals. Now, Baldwin Locomotive had a backlog order, Chrysler was coming through with its plant, while American Car Foundry and American Locomotive were ready to turn out tanks on their assembly lines.
1

“Babe” Meigs (a nickname owing to the fact he was six foot four) had reported that total plane production was up to 1,450 a month; the goal was 2,600 by October. Knudsen estimated they would hit 3,000 to 3,500 a month before 1942 was out.
2
“Powder” Johnson had performed
miracles with the help of DuPont as well as companies with names out of Greek mythology—Hercules, Atlas, and Trojan Powder—in getting new American gunpowder and TNT plants up and operating at sites ranging from Radford, Virginia, to Sandusky, Ohio. Meanwhile—the brightest spot on the horizon—small-arms production at places like Saginaw Steering Gear and the Winchester Company was actually running ahead of schedule. Saginaw was supposed to supply the government with 280 machine guns by March 1942. When that date came, they would ship
28,728
guns.
3

As for raw materials, when Knudsen had come to Washington, the country’s aluminum production was barely 25 million tons. Now it was 40 million, and headed to 70 by the end of the year. Steel was showing similar numbers.
4
If imported materials like tungsten, chrome, and rubber were still in critical short supply, once Henry Kaiser’s yards began turning out ships ready to go fetch them, that would change.

At the top of the page, however, Knudsen scrawled two large numerals:
1
and
8
. That was the magic number: eighteen months. That’s how long Knudsen estimated it would take for American business and industry to make the arsenal of democracy a reality. One year to build new plants and retool the old ones, six months for conversion.

Everywhere he looked, that number held true. A year for tooling for airplane engines, maybe ten months with overtime. A year to tool for tanks of thirty to thirty-one tons. Nine to eleven months for a TNT plant.
5
Then another six months before everyone would see full production—enough guns, tanks, planes, and bombs to sweep Germany and its Axis allies into oblivion.

“Everyone knows that America is the greatest mass producer in the world,” Knudsen kept telling Roosevelt. “Not everyone knows that mass production takes time to get started.” But “once you get going, the momentum takes you a long way”—all the way to victory.
6

Why so long to get started? Because American assembly lines could not get moving until they had the machine tools for the job. Machine tools are the heart of the industrial process. They can drill; they can bore; they can turn steel like table legs on a lathe or slice slabs of iron like a wood plane. They take steel, cast iron, brass, and aluminum and mill, grind, shear, and press them into parts for household or industrial
goods. Their design depends on the amount of force needed behind the grinding, cutting edge.
7

This means some machine tools are not much bigger than a bread box; others are the size of a house. In 1940 eighty-seven were necessary to make the average propeller shaft, from lathes to cut the shaft metal to machines to bore it and grinders to finish the job. The men, and later women, who ran the machine tools were the grunts, the unsung but essential foot soldiers of the modern industrial process. The machine tool makers were its elite, its master sergeants—except that they were aloof from the processes they set in motion. One admirer dubbed them the “master builders of the Industrial Revolution”—except that what they brought into being weren’t soaring cathedrals of stone but sprawling factories of iron and steel.
8

In 1940 almost every machine tool in America came from two hundred firms. Most had barely one hundred employees; some, fewer than fifty. Most of the best firms were concentrated in New England, and three of the biggest were in Vermont, in the Black River Valley, where their origins reached back to the American Revolution.
9
Their hands smeared with oil and aprons with grease, generation by generation they labored to create the machines that made every product from cars to refrigerators and industrial fans.

The Depression years had been hard on the machine tool makers. In 1929 total American sales were $185 million; in 1932 they were hardly over $22 million. Companies like Jones and Lamson of Springfield, Vermont, and Cincinnati Milling Machine had filled the gap with foreign orders—ironically, one of their best customers was imperial Japan, whose Mitsubishi and Kawasaki aircraft factories hummed to the tune of American machine tools.
*
When the war buildup started, Jones and Lamson’s president, Ralph Flanders, warned Knudsen and the NDAC that the need for machine tools would be “infinite” and that they were going to find themselves up against the wall in getting enough grinders, borers, and stamping and milling machines.
10
Roosevelt had put a
halt to exports of machine tools, even to Great Britain. Then machine tool makers could only send new tools to those companies on the defense priorities list. Even so, dealing with the problem had been largely put off until now.

The first part of Knudsen’s plan had been under way since the previous June. New plant construction had been booming for almost a year, with Jesse Jones putting up more than $33 million for new facility construction for War Department orders.
11
Some 784 new factories had been started and more than half were finished.
12
Thanks to miracle workers like Albert Kahn, the work went even faster than many thought possible. K. T. Keller came to Kahn on a Wednesday looking to build Chrysler a new machine shop five hundred feet wide and two-thirds of a mile long. Kahn had the plans ready by Friday morning, and ninety days later the building was going up.
13

April, May, and June 1941 were the next critical months, when retooling around the country would kick in. To make sure that happened, Knudsen went to find Fred Geier.

Geier was president of Cincinnati Milling Machine and president of the Machine Tool Builders’ Association. Over time, as America’s manufacturing spread over the Old Northwest and across the Mississippi, two firms rose up to challenge the mighty New England machine tool empire. One was Cleveland Machine Tool; the other, Cincinnati Milling Machine. Fred had inherited the latter company from his father, a German immigrant’s son who sold Henry Ford his first machine tool before passing the firm over to his extraordinary son.
14

Fred Geier did not fit the image of the hard-charging American businessman. He was soft-spoken and formally dressed (he often appeared on the golf course in a three-piece suit) and had been educated at exclusive Williams College. He could read Latin and Greek with ease and didn’t drink or smoke.
15

Beginning in 1932–33, he had made several trips to Germany, which was still the Olympus of machine tool makers, and was shocked by what he saw: the persecution of Jews, the dogmatic militarism, the frantic arms buildup. It convinced Fred Geier that war was coming and that his business had better get ready for it. In 1938 he began doubling the size of his plant and put in a new foundry and a new office building—all
out of his own profits (Geier despised debt as much as he hated liquor).
16

In the spring of 1941, Fred Geier was president of the Machine Tool Builders’ Association, and Bill Knudsen caught up with him at the association’s annual meeting at the Hotel Cleveland on May 5 and 6. Though Geier’s prediction of war had been borne out by events, he was still amazed when Bill Knudsen told him he wanted production of machine tools in America to double, redouble, and redouble again—all inside a year.
17

“You’re crazy,” Geier said good-naturedly, “but then so are we. When do you want them?”

“Right away,” Knudsen answered with a straight face, “and in the ratio I mentioned.” Geier knew Knudsen well enough to know he meant it.
18

Geier and his colleagues did as the Great Dane asked. Over the next months, they and their factories would labor round the clock to produce a bewildering range of machine tools. In 1940 they had produced some 110,000. In what was left of 1941, they nearly doubled that number, to 185,000.
19
By 1942, Geier’s Cincinnati Milling Machine was making a new machine tool every seventeen minutes, seven days a week, around the clock.

One of the biggest and most important was a giant machine for boring giant naval guns. Geier had seen one in action in Germany in the thirties, and secretly bought one in defiance of Nazi export rules. He managed to smuggle it out of the Third Reich, piece by piece, through Switzerland and Italy and then reassembled it in Cincinnati. It was this mammoth machine, the pride of Geier’s factories, that would bore the great sixteen-inch guns for battleships like the
Iowa, New Jersey
, and
Missouri
.
20

Knudsen and Geier did not stop there. In late June they launched a nationwide survey to track down every machine tool made in America in the past ten years, especially twenty-one types that were considered critical to the defense industry. Knudsen put OPM’s tool man, Mason Britton, on the scent of “idle” tools, so that used tools could be mobilized as well as new ones.
21

The amazing machine tool production numbers fell off in 1943 and
slid back to normal by 1944. But by then the necessary machines were in the factories and doing their job. The critical fuse for the great explosion of productivity in America’s defense industry after Pearl Harbor had been laid, thanks to Knudsen and the tough-minded teetotaler from Cincinnati Milling.

Still, the criticisms did not stop. One of the first, and in many ways the most perceptive, came in the pages of
Fortune
magazine in April. It charged that Washington had underestimated “the size of the effort necessary to build an armament economy without turning the civil economy inside out.” The fact is, it read, “national defense is in pretty bad shape, and everyone in and out of Washington has seen the defense program drift and stumble.”
22

Time had been wasted putting Bill Knudsen in charge of policy and contracts, for example, when he should have been put in charge of directing production.
Fortune
’s editors blasted Stettinius for accepting the Army’s estimates of how much steel would be needed, with shortages now predicted for the rest of 1941 and into 1942. It damned the administration for failing to impose stricter price controls when armaments orders piled on top of a growing civilian demand meant prices would inevitably skyrocket.

Barely 10 percent of the country’s factories had converted to war production. America, it seemed, needed a Dunkirk in order to get serious about defense. “The job is plain: tool up now so that we can deliver later”—which was exactly what Knudsen was doing, although no one at
Fortune
took notice.
23

Instead, many blamed Knudsen for the delays. “Knudsen is simply not delivering the goods,” Harold Ickes complained in his diary. “Big business is having too much say.” Columnist Walter Lippmann accused Knudsen of organizing the entire war effort “as a kind of annex and superstructure to an immense boom in private business.” Stimson himself was getting worried. “I’m afraid that Knudsen is too soft and too slow,” he wrote on May 29, “because of his connection with the auto industry.”
24
All asked the same question: When would he finally put defense ahead of business as usual?

The person who really needed to answer that question was the president, who had been so passive all spring. Finally something happened to snap Roosevelt out of his lethargy. On May 21 an American freighter, the SS
Robin Moor
, was sunk by a German U-boat inside the security zone. The Germans had allowed the crew and passengers to load into lifeboats before a torpedo sent the
Robin Moor
to the bottom, but it was two weeks before a passing steamer picked up the wretched survivors.

BOOK: Freedom's Forge
8.23Mb size Format: txt, pdf, ePub
ads

Other books

Wolfsbane by Andrea Cremer
The Linguist and the Emperor by Daniel Meyerson
Vivaldi's Virgins by Quick, Barbara
Keep Dancing by Leslie Wells
The Defector by Evelyn Anthony
The Darcy Code by Elizabeth Aston